- Home
- About WIP
- Participating Entities
- Animas-La Plata Water Conservancy District
- City of Durango Water Commission
- Colorado Water Resources and Power Development Authority
- Dolores Water Conservancy District
- Florida Water Conservancy District
- La Plata Electric Association
- La Plata Water Conservancy District
- Mancos Conservation District
- Mancos Water Conservancy District
- Pagosa Area Water and Sanitation District (PAWSD)
- Pine River Irrigation District
- San Juan Water Conservancy District
- Southwestern Water Conservation District
- U.S. Bureau of Reclamation
- Regional Water Projects
- Animas River Stakeholders
- Animas-La Plata Project
- Cloud Seeding Program
- Dolores Project (McPhee Reservoir)
- Dry Gulch Reservoir (Pending)
- Florida Project (Lemon Reservoir)
- Jackson Gulch Reservoir
- Long Hollow Reservoir
- Pine River Project (Vallecito Reservoir)
- Rio Blanco Restoration Project
- River Protection Work Group
- UMETCO (Urivan) Water Rights
- Water Information
- Resources
- News
- Contact WIP
- Colorado, Colorado Oil and Gas Conservation Commission, Water Quality, Oil and Gas Development
Milltown Dam
March 19, 2008--A river to run through it again (LA Times)
Every evening, a 45-car train rumbles away from the Clark Fork River, loaded not with copper, gold or silver ore, but with the toxic legacy of more than a century of mining: tons of contaminated mud from behind an old dam.
October 2007--Removal of dam's toxic mud to begin (US Water News)
A two-year project to move trainloads of accumulated toxic mud from a dam and haul it 90 miles for disposal is set to begin soon. The work is a major step toward the 2008 removal of the century-old Milltown Dam on the Clark Fork River near Missoula.
Published in
